HECD–65 & HECD–130 Installation & Operations Manual
PRE-COMMISSIONING CHECKLIST
Customer: __________________________________ Date: ____________________________
Job Name: __________________________________ Model #: ____________________________
Location: __________________________________ Serial No.: ____________________________
__________________________________
Please complete one checklist for each ozone generator to be commissioned.
Initial all items, note any exceptions/deviations observed including related item numbers and detail
of any corrective action taken or recommended.
_____
_____
_____
_____
_____
_____
_____
_____
_____
_____
_____
_____
_____
_____
_____
_____
_____
1. Ozone generator
a) Properly anchored to mounting surface.
b) Correct voltage supplied and connected.
c) Cooling water supply and return connected from proper source.
d) Ozone line (St. steel or Teflon) connected to outlet fitting.
e) Flow switch (or pump interlock) connected.
2. Injector(s)
a) Correct orientation with water flow direction.
b) Ozone line (St. steel or Teflon) connected with st. steel ball valve and check valve
at or near injector.
3. Ozone destruct(s)
a) Securely mounted
b) Inlet, vent, and drain connections correct.
c) 110 VAC outlet provided (catalytic destruct only).
4. ORP (or other) sensor probe(s) properly installed in accessible location for maintenance.
Cable connected to ORP controller.
5. Ambient ozone monitor(s)
a) Properly installed and interlocked with ozone generator.
b) Sensor installed per manufacturers instructions
6. Contact Tank(s) or Mixing Tower(s) Properly mounted and plumbed.
7. Degas valve(s) installed properly and plumbed to ozone destruct inlet.
8. Main circulation system in working order including pumps, filters, heater, …
9. Booster pump operational and ozone side-stream plumbing complete and in proper
operating order.
Use a second sheet for notes if necessary.
Signed: __________________________________